Paggamit: Scaffolding ay isang pansamantalang istraktura na ginagamit upang suportahan ang mga tao at materyal sa konstruksiyon o pagkukumpuni ng mga gusali at iba pang malalaking istruktura. Materyal Storage Rack, Pallets, Hydraulic Platform, Trusses, Haligi, purlins, Greenhouse, Kumakatawan Towers, Agricultural Equipment
Standard: BS 1139, BS1387-1985, EN 39, EN10219, JIS G 3444
Certificate: EN10217, EN10219, API 5L PSL1 / PSL2, API 5CT
Out Diameter: 27mm, 38mm, 42mm, 48.3mm-48.6mm
Wall kapal: 2.0mm, 2.5mm, 2.75mm, 3.0mm, 3.25mm, 3.85mm, 4.0mm
Length: 5.8M, 6m, 6.4M, 6.5m, 0.3-18m
End: Square cut, Burr dahil
Steel Grade: Q195, Q215, Q235, Q345, S235JR, S275JR, STK400, STK500
Ibabaw: Nang basta-basta nilangisan, Hot lumangoy galvanized, Electro galvanized, Black
Packing: Plastic plugs sa parehong dulo, Naka-wrap sa waterproof paper o PVC manggas, at pananamit ng magaspang na may ilang piraso steel Plastic plugs sa parehong dulo.
Test: Chemical Component ng Pagsusuri, Mechanical Katangian (Ultimate makunat lakas, ani lakas, pagpahaba), Technical Properties (Pagyupi pagsubok, paglapad test, baluktot Test, Hardness Test, Blow Test, Epekto Test atbp), Panlabas Sukat Inspection.
Mill Test Certificate: EN 10204 / 3.1B
Payment Terms: T/T, L/C
Produksyon ng Oras 7-40 araw
Delivery Time 7-40 days
Trade terms: FOB, CFR, CIF
Delivery Detail:Depends on your order quantity.
Packaging Detail: Packing in bundles or for the client's requirement
Supply Ability: 500 Metric Ton/Metric Tons per Day
Mataas na makunat yero scaffolding steel pipe ay dinisenyo para sa pipe at coupler plantsa.
Ang pipe ay may hot-dipped galvanized ibabaw tapusin sa gayon ay upang magbigay ng mahusay na hitsura sa
sapat na tibay sa naturang mga application na kung saan ang maalat air o pang-matagalang exposure ng panahon ay hindi maiwasan.
yero plantsa pipe | yero plantsa pipe | yero plantsa pipe |
Sa labas diameter (mm) | Wall kapal (mm) | Haba (m) |
48.3-48.6 | 2.0-2.5 | 0.3-12 |
48.3-48.6 | 2.75 | 0.3-12 |
48.3-48.6 | 3 | 0.3-12 |
48.3-48.6 | 3.2 | 0.3-12 |
48.3-48.6 | 3.6 | 0.3-12 |
48.3-48.6 | 3.8 | 0.3-12 |
48.3-48.6 | 4 | 0.3-12 |
38.1 | 4 | 0.3-12 |
42.3 | 4 | 0.3-12 |
Yero Scaffold Tube Type 4 BS1139 & EN39 |
|||
kodigo |
Item |
laki |
WT (KG) |
WST40 |
Yero Scaffold Tube Type 4 |
OD48.3 × 4.0mm |
26.21 |
Yero Scaffolding Pipes Uri 3 BS1139 & EN39 |
|||
kodigo |
Item |
laki |
WT (KG) |
WST32 |
Yero Scaffolding Pipe Type 3 |
OD48.3 × 3.2mm |
21.35 |
2.7mm Scaffold Tube OD 48.3mm |
|||
kodigo |
Item |
laki |
WT |
WST27 |
Scaffold Tube 2.7mm |
OD48.3 × 2.7mm |
18.22 |
2.5mm Scaffold Tube O.D48.3mm |
|||
kodigo |
Item |
laki |
WT |
WST25 |
Scaffold Tube 2.5mm |
OD48.3 x 2.5mm |
16.95 |
2.2mm Scaffolding GI Pipe OD 48.6mm |
|||
kodigo |
Item |
laki |
WT (KG) |
WST22 |
Scaffolding GI Pipes 2.2mm |
OD 48.6 x 2.2mm |
15.10 |
1.8mm Scaffolding GI Pipe OD 48.6mm |
|||
kodigo |
Item |
laki |
WT (KG) |
WST18 |
1.8mm Scaffolding GI Pipe |
OD48.6 x 1.8mm |
12.46 |
2.0mm GI Pipe Scaffolding OD 48.6mm |
|||
kodigo |
Item |
laki |
WT (KG) |
WST20 |
2.0mm GI Pipe Scaffolding |
OD48.6 x 2.0mm |
13.79 |
Scaffold Steel Black Tube MS OD 48.3mm |
|||
Code No. |
Item |
paglalarawan |
Steel Grade |
WST4820 |
Black Scaffold Tube 48 × 2.0mm |
OD48.3 x 2.0mm |
Q235 | Q345 |
WST4822 |
Black Scaffold Tube 48 × 2.2mm |
OD48.3 x 2.2mm |
Q235 | Q345 |
WST4825 |
Black Scaffold Tube 48 × 2.5mm |
OD48.3 x 2.5mm |
Q235 | Q345 |
WST4828 |
Black Scaffold Tube 48 × 2.8 mm |
OD48.3 x 2.8 mm |
Q235 | Q345 |
WST4830 |
Black Scaffold Tube 48 × 3.0mm |
OD48.3 x 3.0mm |
Q235 | Q345 |
WST4832 |
Black Scaffold Tube 48 × 3.2mm |
OD48.3 x 3.2mm |
Q235 | Q345 |
OD60mm Steel Scaffolding Pipes |
||||
kodigo |
Item |
laki |
Steel Grade |
ibabaw |
WST6017 |
1.7mm Scaffold Black Tube OD60.3mm |
OD 60.3 × 1.7mm |
Q235 | Q345 |
galvanized | itim |
WST6018 |
1.8mm Scaffold Black Tube OD60.3mm |
OD 60.3 × 1.8mm |
Q235 | Q345 |
galvanized | itim |
WST6020 |
2.0mm Scaffold Black Tube OD60.3mm |
OD 60.3 × 2.0mm |
Q235 | Q345 |
galvanized | itim |
WST6022 |
2.2mm Scaffold Black Tube OD60.3mm |
OD 60.3 × 2.2mm |
Q235 | Q345 |
galvanized | itim |
WST6025 |
2.5mm Scaffold Black Tube OD60.3mm |
OD 60.3 × 2.5mm |
Q235 | Q345 |
galvanized | itim |
WST6030 |
3.0mm Scaffold Black Tube OD60.3mm |
OD 60.3 × 3.0mm |
Q235 | Q345 |
galvanized | itim |
WST6032 |
3.2mm Scaffold Black Tube OD60.3mm |
OD 60.3 × 3.2mm |
Q235 | Q345 |
galvanized | itim |
WST6036 |
3.6mm Scaffold Black Tube OD60.3mm |
OD 60.3 × 3.6mm |
Q235 | Q345 |
galvanized | itim |
WST6040 |
4.0mm Scaffold Black Tube OD60.3mm |
OD 60.3 × 4.0mm |
Q235 | Q345 |
galvanized | itim |
OD42.7 mm Scaffold Steel Tube |
|||
kodigo |
Item |
laki |
ibabaw |
WST4216 |
1.6mm Scaffold Tube OD 42.7mm |
OD42.7 × 1.6mm |
galvanized | itim |
WST4217 |
1.7mm Scaffold Tube OD 42.7mm |
OD42.7 × 1.7mm |
galvanized | itim |
WST4218 |
1.8mm Scaffold Tube OD 42.7mm |
OD42.7 × 1.8mm |
galvanized | itim |
WST4220 |
2.0mm Scaffold Tube OD 42.7mm |
OD42.7 × 2.0mm |
galvanized | itim |
WST4222 |
2.2mm Scaffold Tube OD 42.7mm |
OD42.7 × 2.2mm |
galvanized | itim |
WST4224 |
2.4mm Scaffold Tube OD 42.7mm |
OD42.7 × 2.4mm |
galvanized | itim |
WST4225 |
2.5mm Scaffold Tube OD 42.7mm |
OD42.7 × 2.5mm |
galvanized | itim |
WST4227 |
2.7mm Scaffold Tube OD 42.7mm |
OD42.7 × 2.7mm |
galvanized | itim |
WST4230 |
3.0mm Scaffold Tube OD 42.7mm |
OD42.7 × 23.0mm |
galvanized | itim |
WST4232 |
3.2mm Scaffold Tube OD 42.7mm |
OD42.7 × 3.2mm |
galvanized | itim |
WST4235 |
3.5mm Scaffold Tube OD 42.7mm |
OD42.7 × 3.5mm |
galvanized | itim |
Walang kalaman-laman / Painted / Banayad na nilangisan / Galvanized / sim patong / Primering / Powder Coat