SHINESTAR STEEL GROUP CO., LTD

盛仕达钢铁股份有限公司

Working principle of pipe jacking

Pipe jacking construction is an underground pipeline construction method developed after shield construction. It does not require excavation of surface layers, and can pass through roads, railways, rivers, surface buildings, underground structures, and various underground pipelines.

Pipe jacking construction uses the thrust of the main jacking cylinder and the relay room between pipelines to push the tool pipe or road-header from the working well through the soil layer to the receiving well. At the same time, the pipeline immediately after the tool pipe or the boring machine was buried between the two wells, in order to realize the construction method of laying underground pipelines without excavation.


Post time: Jul-04-2023

We use cookies to offer a better browsing experience, analyze site traffic, and personalize content. By using this site, you agree to our use of cookies.

Accept