First, the advantages of DN900 plastic coated steel pipes
1. Good corrosion resistance: The surface of DN900 plastic coated steel pipes has been specially treated to have good corrosion resistance, and can maintain good use effects even in harsh environments.
2. Long life: DN900 plastic coated steel pipes are made of high-quality steel, and have a long service life after strict production and quality control.
3. Strong pressure resistance: DN900 plastic coated steel pipes have high pressure resistance, can withstand greater pressure, and are not easy to deform and rupture.
4. Safe and reliable: DN900 plastic coated steel pipes have good sealing performance and high temperature resistance, which can ensure the safety and reliability of the conveying medium.
5. Easy maintenance: DN900 plastic coated steel pipes have a smooth inner surface, are not easy to accumulate debris, and are easy to clean and maintain.
Second, the application field of DN900 plastic coated steel pipe
1. Petrochemical industry: DN900 plastic coated steel pipe is one of the main pipelines for transporting oil, gas, water, and other media in the petrochemical industry. It is widely used in the fields of oil and natural gas extraction, storage, transportation, processing, etc.
2. Municipal engineering: DN900 plastic coated steel pipe is a common pipeline for transporting tap water, sewage, hot water, and other media in municipal engineering.
3. Heating industry: DN900 plastic coated steel pipe is one of the main pipelines for transporting hot water, steam, and other media in the heating industry.
4. Other fields: DN900 plastic coated steel pipe can also be used in construction, bridges, tunnels, and other fields.
Third, the production of DN900 plastic coated steel pipe
The production of DN900 plastic coated steel pipe mainly includes the following steps:
1. Steel pipe pretreatment: including degreasing, pickling, phosphating, and other treatments.
2. Powder spraying: Spray powder coating on the surface of the steel pipe to form a uniform coating.
3. Curing and baking: The steel pipe after spraying the paint is sent to the baking room for curing treatment so that the coating is firmly attached to the surface of the steel pipe.
4. Cooling and quality inspection: The plastic-coated steel pipe after curing needs to be cooled and inspected to ensure product quality.
5. Packaging and delivery: The plastic-coated steel pipe that has passed the quality inspection is packaged and shipped.
Post time: Jun-06-2025